Purchasing Services

Field Hockey Turf Replacement

CD's available Tuesday, March 19, 2013

Bid Document Requests Forms may now be emailed to biddoc@bsu.edu


Scope of Work: The work includes but is not necessarily limited to excavation for and installation of underground irrigation service piping, installation of irrigation high-volume heads, installation of booster pump including associated electrical work, backfill and compaction, removal of the existing turf, inspection of the existing shock-layer pad and curbs, patching of existing shock-layer, cleaning and preparation of the existing shock-layer to accept the replacement turf, installation of the new turf per accepted Alternate, and restoration of the stone border and other existing materials disturbed during construction.

Estimated Cost: $900,000.00

Anticipated Start Date: May 1, 2013

Substantial Completion Date: August 1, 2013

 

Related Documents:

  • Notice to Bidders (PDF)  
  • Planholders (PDF)
  • Addendum 1 issued March 22, 2013 (PDF)
  • Addendum 2 issued April 4, 2013 (PDF)
  • Bid Results (PDF)  
  •  

     

    Documents are available on CD and may be obtained by faxing or emailing the Bid Document Request Form (PDF) to Purchasing Services 765-285-1756 or biddoc@bsu.edu. The online documents require Adobe Reader. If having trouble viewing documents, try using a different browser, such as Firefox or Chrome.